What The Service Covers
Dispatch & Site Handling
Fans are packed for transit and delivered to site with a packing list. Blades, hub and structure are checked against the list before installation begins.
Hanging Structure Fitment
The IS 2062 M.S. structure is fixed to the roof truss or purlin as designed, with SS wire rope wrapped around every bolted joint as secondary restraint.
Fan Assembly & Mounting
Hub, blades and motor assembly are fitted with high tensile 10.9 grade fasteners and Nyloc nuts, and on the gearless range the extension tube, motor and hub hang from an anti-fall mounting bracket.
Control Panel Mounting
The VFD panel is mounted at 4 – 5 ft floor level for operator access, in a position clear of wash-down, oil and dust zones.
VFD Commissioning
Parameters are set for the model, speed band configured, direction tested and the plug-and-play cabling verified end to end.
Handover & Operator Briefing
Run test at full speed range, handover of documentation, and a briefing for the operators who will actually use the keypad.
What You Get
- Qualified technicians deployed from our own team
- Hanging structure fabricated to your roof arrangement
- SS wire rope secondary restraint as standard
- VFD parameter setting and commissioning
- Run testing across the full speed range
- Operator briefing and handover documentation
Six Steps From Enquiry To Quote
Knowing Customer Requirement
Understanding the purpose, application and comfort expectation for the space.
Collecting Site Data
Shed dimensions, roof height, floor layout, obstructions and hanging arrangement.
Evaluating Feasibility
Checking whether HVLS is the right fit and what the structure can carry.
Selection
Choosing fan diameter, drive type and quantity for uniform coverage.
Optimizing The Selection
Reworking the layout to reduce total fan count without losing coverage.
Submitting The Quote
Techno-commercial offer with GA drawing and layout marked for your facility.
About Supply & Installation
Our own qualified technicians handle installation and commissioning. Structure welding is done by certified welders.
A single fan typically takes half a day including structure fitment and commissioning, assuming access equipment is available at site.
Yes. Installation is normally scheduled zone by zone over off-peak shifts or weekends so production continues.
Access equipment such as a scissor lift or scaffolding, a power point for the panel, and the electrical supply run to the panel position.